Highways Roads

  • Consultancy Services for “Authority’s Engineer for Supervision of Rehabilitation and upgradation of Nasratpur to Barasgaon section of NH-222 [Design Ch. 66+700 to Ch. 92+565 and Design Ch. 92+565 to Ch. 96+750] to Four-lanes with paved shoulders on EPC Mode under NHDP-IV in the State of Maharashtra” (Total Length-30.05 km) [Job No. 222-MAH-NHDP-IV-2016-17-17]
  • Consultancy Services for “Authority’s Engineer for Supervision of rehabilitation and upgradation to 2 lane with paved shoulder/4 lane standards of National Highway section Upgradation of Anjangaon-MP Border section of NH-548C under EPC Mode in the State of Maharashtra” (Length-41.3 km) Package No.: NH/MAH/PWD/Nagpur-10/AE/Pkg-21
  • Consultancy Services for “Authority’s Engineer for Supervision of Widening existing 2 lane to 2 lane with 1.5 m wide paved shoulder from Km 50/000 to 140/900 of NH-57 on EPC mode in the State of Odisha” (Total Length-89.138 km
  • Consultancy Services for “Authority’s Engineer for Supervision of Widening existing 2 lane to 2 lane with 1.5m wide paved shoulder from Km 0/0 to 81/0 and Km 93/0 to 119/0 of NH-157 on Engineering, Procurement & Construction (EPC) Mode in the State of Odisha” (Total Length-107.0 km)
  • Consultancy Services for “Authority Engineer for (1) Remaining work for construction of 2 Lane PSC High Level Bridge with foot-path across the River Champa in 123th km of NH-80 (Job No. 080-Bihar 3/2015-16/008) & (2) Remaining work for construction of 2 Lane PSC High Level Bridge with foot-path across the River Vena in 155th km of NH-80 (Job No. 080-Bihar 2/2015-16/009) under EPC mode of procurement in the state of Bihar”
  • Consultancy Services for “Authority’s Engineer for (1) Widening to 2 lane with paved shoulder from km 0.00 to 40.00 of NH-2C (Dehri-Banjari-Akbarpur Road, (2) Construction of ROB and its approach in lieu of existing level crossing (L.C. No.-48-A/3T) at Km. 119 on N.H.-30 under NH(O) Annual Plan-2016-17 under EPC mode of procurement in the state of Bihar
  • Consultancy Services for “Authority’s Engineer for Upgradation to 2 lane with paved shoulders with rigid Pavement from KM 37/400 to 66/700 on NH-848 (Kaparada to Rajbari Section) on EPC mode in the State of Gujarat” (Total Length-29.30 km)
  • Consultancy Services for “Authority's Engineer for Supervision of project of 2/4 lanning with Paved Shoulders of Govindpuri (Rajgunj) - Chas – West Bengal Border section of NH-32 from km. 0.00 to km. 56.889 under NHDP Phase-IV on EPC mode in the state of Jharkhand” (Total Length-56.889 km)
  • Consultancy Services for “Authority’s Engineer for Widening from two lane to four lane with paved shoulder and strengthening of existing pavement between Km 459/500 to 483/500 (Road connecting Statue of Unity) Devaliya to Rajpipla including reconstruction of old and narrow minor bridge NH-56 on EPC mode in the State of Gujarat” (Total Length-24.0 km)
  • Authority’s Engineer for Supervision of Rehabilitation and up-gradation of NH-78 (New NH 43) from Km 468.600 to Km 531.250 (Pathalgaon to Kunkuri section) to two lane with paved shoulder in the State of Chhattisgarh under NHDP –IV through Engineering, Procurement & Construction (EPC) Basis Contract in the state of Chhattisgarh” (Total Length-62.475 km)
  • Consultancy Services for “Supervision and Quality Control during the construction period of the identified State Highways and Major District Roads Projects of West Zone & Ujjain Zone of MPPWD in the state of Madhya Pradesh (Total Length-950 km) 2 lane – 771 km include Hill Roads and 4 lane - 184 km
  • Consulting Services as “Independent Engineer Services during O&M Period for the project of 2 Lanning with Paved Shoulders of Agra to Aligarh Section of NH-93 from Km. 0 / 000 to Km. 79 / 000 (New NH-509 from Km. 234.412 to Km. 153.000) on Design, Build, Finance, Operate and Transfer (DBFOT) on Toll Basis under NHDP Phase – IVA in the State of Uttar Pradesh” (Total Length-81.40 km)
  • Consultancy Services for “Authority’s Engineer for Supervision of Construction of Fly-over at Derabassi from Km. 29.830 to Km 30.970 of NH-22 (Ambala-Chandigarh Section) on Engineering, Procurement and Construction (EPC) basis in the state of Punjab 4 Lanning Fly-over at Derabassi from Km. 29.830 to Km 30.970 (1.34 km) of NH-22 (Ambala-Chandigarh Section)
  • Consultancy Services for Supervision of Short Term Improvement and Routine Maintenance Contract of 4 lane of Garamore to Samakhiyali section from Km 254.000 to Km 306.000 of NH-8A in the state of Gujarat” (Total Length – 51.00 km) - 4 Lanning of NH-8A (51 km)
  • Consultancy Services for “Supervision of Short Term Improvement and Routine Maintenance for the stretch of 4 lane of Bhubaneswar–Sunakhala-Ichapuram (Chainage Km.413.00 to Km. 233.20) Section of NH -5 in the State of Odisha” (Total Length-185 km) Consultancy Package No.: 1/2014 4 Lanning of NH-5 (185 km)
  • Engagement of Project Development Consultant for development of “Agra to Lucknow 6/8 lane Access Controlled Expressway (Green Field) Project” in Uttar Pradesh-Total Length-302 km. (in JV with Feedback Infra.
  • Consultancy Services for “Independent Engineer for development of Two Laning of (i) Jabalpur – Patan– Shahpura (SH-15 & SH-22-A) Road (Total Length-38.75km) and, (ii) Uchera – Nagod – Singpur – Kalinjer (SH-56) Road (Total Length-55.60 km) under one Package on BOT (Toll + Annuity Scheme) basis” in the state of Madhya Pradesh
  • “Supervision of Short Term Improvement and Routine Maintenance of Contract of Aurangabad - Gorhar Section from Km 180.00 to Km 320.00 of 4 lanning of NH-2 in the state of Bihar and Jharkhand”
  • “Supervision of Short Term Improvement and Routine Maintenance Contract of Garmukteshwar to Moradabad Section from km. 93.00 to km. 149.35 of 4 lanning of NH-24 in the state of Uttar Pradesh”
  • Consulting Services as “Independent Engineer Services during O&M Period for the project of 2 Lanning with Paved Shoulders of Agra to Aligarh Section of NH-93 from Km. 0 / 000 to Km. 79 / 000 (New NH-509 from Km. 234.412 to Km. 153.000) on Design, Build, Finance, Operate and Transfer (DBFOT) on Toll Basis under NHDP Phase – IVA in the State of Uttar Pradesh” (Total Length-81.40 km)
  • Preparation of Feasibility Report for 2-lannes in hill areas and 2-laning with Paved Shoulder in Plan Area for - 1. Rudrapur-Haldwani State Highway No.-5 (Length-24.64 kms.) 2. Kathgodam-Bhimtal-Bhawali. State Highway No.-10 (Length-28 kms.) 3. Nainital-Kaladhungi-Bazpur-Doraha. State Highway No.-13. (Length 63.43 kms.)
  • Independent Technical cum Quality Control Consultants for the work of Development and Maintenance of Integrated Township at Baran, District Patiala involving 4/6 lane road highways (Total Length-69.65 km).
  • Consultancy Services for “Supervision of Short Term Improvement and Routine Maintenance works on the selected stretches of PIU - Narsinghpur of National Highway No.: 12 (Rajmarg-X – Bareli)” in the state of Madhya Pradesh- Package MP SPRVN - 2 : Total Length – 100 km
  • Feasibility Study and Preparation of Detailed Project Reports for Up-gradation of the Existing 2-Lane Single Carriageway to 4/6-Lane Divided Carriageway between Km. 0/0 to 50/700 (Section Zirakpur to Patiala) including 12 no. Bridges of 640 mtr span (10 minor bridge, 1 ROB (1200 mtr) & 2 Grade Separators (600 m each) of NH-64 in Punjab (Under DBFOT Scheme)
  • “Feasibility Report of Ranchi to Birmitrapur, National Highway-23 (2-lane) in the State of Jharkhand on Design, Build, Finance, Operate & Transfer (DBFOT) Pattern ”– Total Length – 216 km (in JV with DHV (India) Pvt Ltd.)
  • Concept Report of 8-Lane Access Controlled Expressway from Narora to UP Border and High Speed Corridor from Varansai to Paradeep Port
  • Concept Report of 8-Lane Expressway from Jhansi-Lucknow-Gorakhpur to Kushinagar along bank of Betwa and Ghaghra rivers and Lucknow-Barabanki-Nanpara Link Expressway
  • Concept Report of 8-Lane Expressway from Kotdwar to Fatehgarh river Ramganga and Kotdwar to Bijnor
  • Preparation of Detailed Project Report for the Development of 2-Lane State Highways with paved shoulder/4 lane provision in the State of Bihar including 7 no. Bridges (1 Major & 6 Minor) under RSVY Scheme for Package – 2 (Gopalganj, Sheohar and Saran Districts)–Length 91.50 km
  • Preparation of Detailed Project Report for the Development of 2-Lane State Highways with paved shoulder/4 lane provision in the State of Bihar including 4 no. Bridges (1 Major & 3 Minor) under RSVY Scheme for Package – 5 (Buxar and Bhabhua Districts)-Length 98.68 km
  • Preparation of Detailed Project Report for the Development of 2-Lane State Highways with paved shoulder/4 lane provision in the State of Bihar including 3 no. Bridges (Minor) under RSVY Scheme for Package – 6 (Patna and Nalanda Districts)-Length 81.22 km
  • Design of 4-Lane, 6-Lane and 8-Lane urban roads for township at Bawana for DSIDC, Govt. of Delh
  • Feasibility Study and Preparation of Detailed Project Report for Rural Roads under (PMGSY) Scheme in Bihar State – Second Rural Roads Project (P096020) World Bank Project
  • Detailed Project Report and Construction Supervision and Project Management for development of 260-km State Highway (2-lane) including structures like Grade Separators, interchanges and over bridges from Jammu to Kistwar
  • Preparation of Detailed Project Report for 260 Km. State Highway for Dul Hasti H.E. Project in J & K.
  • Widening of 4-Lane Vijayawada –Vishakapattanam (24Km) NH-5 in Andhra Pradesh
  • Quality Control, Supervision and Maintenance for the works of Upgradation/Construction of State Highways (2-lane) including structures like Grade Separators, interchanges and over bridges in Hoshangabad, Betul and Harda under PWD Mandi Funds in Madhya Pradesh (Total Length – 116 km)
  • Quality Control, Supervision and Maintenance for the works of Upgradation/ of Roads under State Highways (2-lane) including structures like Grade Separators, interchanges and over bridges in Bhopal, Rajgarh and Sheohar under PWD Mandi Funds in Madhya Pradesh (Total Length – 128 km).
  • Detailed Project Report and Project Management of “Approach Road between Trident Chowk to Eastern Ghat of Tajmahal, Agra (Uttar Pradesh) including Project Management